Chevy Hi-Performance Homepage Chevy High Performance
Facebook Click here to find out more!
Prev  Next
 
Feeding Cable Though The Floor Bolting Cable Near Transmission
Feeding Cable Though The Floor Bolting Cable Near Transmission
Once the cable is fed through the floorboard it must be slid between the top of the transmission and the bottom of the floorboard. From there, it'll travel toward the passenger side and then loop around under the transmission near the tailhousing. With that out of the way, we could remove two bolts from the transmission pan where our GM cable bracket will be fastened too. View Related Article
Tci Floor Mounted Shifter Side View Tci Shifter Top View Shifter Brackets Marking With A Sharpe Where To Drill Holes Drilling Holes For Floor Mount Make Sure When Drilling Not To Hit Any Wires Measuring For Shifter Shifter Needs To Be 3 And Half Inches From The Center Drill Straight Up Drilling Holes For Shifter Cable Shifter Components Assembled Shifter Components
Shifter Cable Shifter Cable Fed And Tighten Down Attaching Block To The Cable Clipping Shifter With Its Retaining Clip Floor Shifter In Place Bolted Floor Shifter Down Feeding Cable Though The Floor Bolting Cable Near Transmission Making Sure Cable Was Snug Tighting Cable Installing Linkage In The Gm Lever Making Sure Lever Can Move Forwards And Backwards Self Made Wiring Harness Desciption Of What Wires Do What
Gear Indicator Hooking Up Gear Indicator Shifter Installed Shifter Installed Without Base Shifter Installed Tci Shifter Installed With Base
Chevy High Performance
Chevy Hi-Performance