496 Short Block Top End Engine Build Installation
|
To fasten the cylinder heads down, following the instructions from ARP, we installed the head-bolt kit. We torqued each 12-point head bolt in a clockwise pattern, starting from the center and working our way out with moly-lube on the threads and oil on the washers. We torqued each to 85 ft-lb, and let them sit for 10 minutes. We then backed off a quarter-turn and retorqued each bolt in the same clockwise pattern. View Related Article
|
|