Vintage Air System Installation Hardline
|
After first lubricating the ends of our hard lines to accept the O-rings (oil is supplied), we installed the #6 hard line from the drier to the lower fitting of the condenser. Then we followed the same method for installing the #8 hard line to the upper fitting of the condenser, which will eventually lead to the compressor. View Related Article
|
|