Pos 20 Z
|
Once cleaned, Sam mixed an in-house blend of quick-drying DuPont Black primer that was supplied by Color Craft. With Oraea on the trigger, both wheelwells and the radiator support were ready to be reassembled in less than 30 minutes. View Related Article
|
|
|
|